Наверх

News

Oil Storage Tank Commissioned at Torgili LODS of Tyumen OTPD

Transneft Siberia has completed technical upgrading of vertical floating-roof tank (VFRT-20000) No. 9 with the total capacity of 20,000 cubic metres at Torgili line operation dispatcher station (LODS) of Tyumen Oil Trunk Pipeline Directorate.

Transneft Siberia Finishes Technical Upgrading of Facilities at Salym-2 PS

Nefteyugansk Oil Trunk Pipeline Directorate (OTPD) of Transneft Siberia has finished a set of construction, installation and commissioning works as part of technical upgrading of the automated process control system (PCS) and revamping of the power supply system, including the construction of an indoor switchgear (ISG), at Salym-2 oil pumping station (OPS).