Наверх

News

Transneft Siberia hosts a general conference of the trade union

Transneft Siberia hosted the united primary trade union organisation’s general meeting. Seventy four delegates from trade union branches, business unit heads as well as heads of the Сompany executive office attended the event, held on 20 April 2018, in Tyumen.

Surgut Oil Trunk Pipeline Directorate celebrates its 50th anniversary

Surgut Oil Trunk Pipeline Directorate (Surgut OTPD) of Transneft Siberia celebrates the 50th anniversary of its founding. In 1968, this branch was established on the basis of the Directorate for Construction of Oil Pipelines in Western and North-Western Siberia to provide maintenance to the Ust-Balyk – Omsk oil trunk pipeline.

Construction of new power supply system starts at Salym-2 PS (oil pumping station)

Transneft Siberia has launched the construction of a new power supply system at Salym-2 oil pumping station (PS) affiliated with Nefteyugansk Regional Oil Pipeline Directorate (RPD). The work is being performed within the scope of the Company’s technical upgrading and overhaul programme to improve the reliability index of the power facilities. The existing power supply system, which has been in use since 1975, has aged and become obsolete. It doesn’t meet the requirements of Transneft’s regulatory documents and standard design solutions anymore.

Representatives of Transneft Siberia and Industrial University of Tyumen hold a brainstorm

Transneft Siberia joined efforts with the Industrial University of Tyumen (IUT) and held a research session to find solutions to a range of problems present in the oil transportation Company’s business lines. This is a new format of cooperation between an enterprise and a relevant higher education institution that envisions considering production tasks and generating solutions in “brainstorm” mode.